Broadband · 2007

Huawei OAN
Section 3

15 OAN configurations across Homs, Hama & Deir Alzour — World Tech Co.'s largest single project at $1.38M.

Huawei OAN Section 3 — network infrastructure deployment
Optical Access Network infrastructure — Homs, Hama & Deir Alzour, 2007

Project Overview

The Huawei OAN Section 3 project was one of the most significant broadband infrastructure deployments in Syria at the time of execution. World Tech Co. was contracted as the primary implementation partner to survey, install, integrate, commission, and obtain acceptance for 15 Optical Access Network configurations across three major Syrian governorates.

With a total contract value of $1.38 million USD, this project represents World Tech Co.'s single largest engagement — a testament to the company's technical capacity and the trust placed in it by Huawei and the Syrian Telecom Establishment (STE).

Scope & Technical Scope

The project encompassed the full delivery lifecycle — from GPS-mapped site surveys through to final acceptance testing. Each of the 15 sites required customised civil works coordination, equipment installation, fibre splicing, OAN configuration, and integration with the existing STE PSTN backbone.

  • 15 OAN configuration sites across Homs, Hama and Deir Alzour
  • Huawei optical equipment supply, installation and commissioning
  • Site surveys and civil works coordination at all 15 locations
  • OTDR testing and full optical link verification
  • Integration with STE PSTN and DSL aggregation backbone
  • Full as-built documentation, acceptance testing and sign-off

Project Phases

Q1 2007

Site Surveys

GPS-mapped feasibility surveys across all 15 sites. Civil works and equipment access planning completed.

Q2 2007

Equipment Delivery & Installation

Huawei OAN equipment installed at all 15 sites. Structured cabling, rack mounting, and power supply systems completed.

Q3 2007

Fiber Splicing & OAN Configuration

Fiber optic splicing, OTDR testing and OAN system configuration completed across all sites. Integration with PSTN backbone initiated.

Q4 2007

Testing, Commissioning & Acceptance

Full acceptance testing by STE engineers. As-built documentation delivered. Final sign-off achieved on schedule.